#4 Clean-Up Excavation

The pond on #4 and the ditch on #3 were excavated on Monday and Tuesday. The
construction zone for the pond at #16 is getting prepared with topsoil and we
should be sodding this site early next week. Topsoil and prep work should
begin on #4 later this week.