1st Hole Drainage Project – Update

Over the last week the Links Staff have been installing slit drains on the left side of the first fairway. To date we have installed more than 3000 linear feet of drainage channels. Some 4 inch connector drains are being installed along with finished grading and sodding.

We plan to have this site ready for play by the weekend.