Tee Construction Update

RE: Tee leveling of #9 and #10 that was included in the 2016 Links Resolutions.

Tee #9 has been surface stripped and root zone added to grade. Tee #10 is being excavated of sod and soil and root zone mix will be added and prepped to the desired grade. We hope to be installing new turf on these sites by next week.

Thank you for your patience.

-Links Department