Chipping Green Construction – June 28

ChippingGreen2

The test green construction on the practice green has begun with the installation of the gravel layer on the sub floor. The existing drain lines were exposed and we found them to be clean and operational which saved us having to replace them. We are in the process of having the root zone material blended and delivered for installation to the 12 inch depth required for bentgrass putting greens construction in our geological location. At that point the root zone mix will be packed and final grading in preparation for fertilizers, bentgrass sod and seed.

Wade Hawksworth
Links Superintendent

This entry was posted in Home. Bookmark the permalink.

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Google+ photo

You are commenting using your Google+ account. Log Out /  Change )

Twitter picture

You are commenting using your Twitter account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s